Architects
From site meeting notes to tracked actions.
A 10-person practice manages several sites. Decisions, photos and notes arrive through different channels and actions are copied manually.
These cases show how we would apply our method to different professional situations. Business profiles, countries, timelines and gains are illustrative assumptions. They do not describe completed client engagements.
Illustrative audit · 4 pages · no registration
- Simulated schedule
- 7 weeks
- Support planned in the scenario
- 8 consulting days
- Simulated net time saving
- 18 h / month
Assumed internal commitment : 4 person-days. Consulting days are spread across the schedule and do not mean full-time attendance. Internal days are additional. Scope and a quote must be agreed for a real engagement.
01 / Proposed audit scope
Architecture practice
Preparing minutes and tracking actions, without technical, structural or planning approval.
What we would examine
20 redacted meeting records, project naming conventions, responsibilities and action history.
02 / The process, department by department
| Department | Simulated starting point | Proposed process | Human approval |
|---|---|---|---|
| Operations & production | Copy actions after meetings | Draft action register per site | Project architect |
| Administration | Scattered versions of minutes | Central approved version and history | Project coordinator |
| Client relations | Manually assemble client updates | Decision summary for approval | Client lead |
The approach to compare
AI-assisted conversion of notes into decisions and actions. Compare with a standard minutes template; synchronise approved actions only.
What stays with the professional
The architect approves minutes, responsibilities and deadlines. AI does not calculate structures or certify project compliance.
03 / From audit to an independent team
7 weeks.
8 consulting days.
A simulated engagement timeline, with a decision and deliverable at every stage. Rollout depends on test results.
Week 1 · 2 consulting days
Observe & measure
20 redacted meeting records, project naming conventions, responsibilities and action history.
Proposed deliverable Process map, baseline measurement and issue register.
Week 2 · 1 consulting days
Scope & decide
Compare simplification, existing features and AI. Define scope, access, full costs and stop criteria before building.
Proposed deliverable Audit report, priority matrix and test protocol.
Weeks 3–4 · 2 consulting days
Prototype
AI-assisted conversion of notes into decisions and actions. Compare with a standard minutes template; synchronise approved actions only.
Proposed deliverable Limited prototype, test set and approval workflow.
Weeks 5–6 · 2 consulting days
Test & decide
No invented action or responsibility; all corrections remain traceable before distribution.
Proposed deliverable Comparative assessment: proceed, adjust or stop.
Week 7 · 1 consulting days
Train & hand over
Train users on routine and exceptional cases. Appoint an owner and document the manual fallback. If testing fails, hand over findings and a correction plan.
Proposed deliverable Usage guide, team workshop and 30-day follow-up plan.
04 / What the scenario aims to achieve
Simulated net time saving
18 h / monthSpend less time reformatting notes and more time coordinating contributors.
- Assumed monthly volume
- 60 meeting records
- Baseline time per unit
- 50 min
- Target time, including human review
- 30 min
- Monthly monitoring and maintenance
- 2 h
Transparent calculation
60 × (50 − 30) ÷ 60 − 2 = 18 h / month
Volume × (baseline time − target time) ÷ 60 − monthly monitoring.
If only half the volume benefits from the process, with the same monthly monitoring: 8 h / month
This calculation is a simulation, not a client measurement. Target time includes corrections and review. Time released is not a demonstrated cash saving; it depends on actual volume and adoption.
Costs to compare with the benefit
Cost advice, data preparation, integration, licences, training and maintenance before committing. Price, return on investment and revenue effects must be established for each engagement.
How we would verify the result
Compare both methods on a set separate from preparation examples. Measure total time, corrections, critical errors and actual use. Keep difficult cases in the assessment; suspend if quality or confidentiality deteriorates.
Professional acceptance criterion : No invented action or responsibility; all corrections remain traceable before distribution.
After the pilot
During the 30 days after an approved pilot: review metrics weekly, examine exceptions and decide whether to maintain, correct or expand the scope. This follow-up period is outside the scenario schedule and consulting days.
Before a pilot, define permitted data, access and any supplier reuse. Country-specific and professional rules must be checked for the real engagement.
Background reference: CNIL, using a generative AI system.Does this sound like your organisation?
Start with your reality: a time-consuming process, your current tools and the people involved. We can assess whether a similar approach makes sense for you.